Site-wide infrastructure for a new urban district

29MVACapacity secured
3,500Multi-utility connections
33kVConnection voltage

At a glance

Client

YTL Group

Sector

Mixed-use

Service

Electric, Gas & Water

Region

South West

 

Project overview

Brabazon is a landmark mixed-use regeneration project located on the former Filton Airfield in Bristol. The scheme is transforming one of the South West’s largest brownfield sites into a new urban district comprising over 6,000 homes, commercial and employment space, educational facilities, retail and leisure destinations, a 20,000 seat events arena and major transport infrastructure.

In detail

 

The challenge

The scale of the development required significant infrastructure works, presenting a number of complex engineering and logistical challenges.

Delivering the new 33kV connection required extensive offsite works along a heavily trafficked route adjacent to a major shopping centre. Section 58 restrictions, congestion and limited highway access limited available construction windows and ruled out conventional excavation techniques.

 

The solution

Last Mile developed a long-term infrastructure strategy aligned with the phased delivery of the wider development. Working closely with the DNO, IDNO and key stakeholders, 29MVA has been secured and a phased connection strategy, including temporary solutions, has been established.

Last Mile prioritised the delivery of the primary substation and site-wide 11kV infrastructure, creating a scalable electrical network capable of supporting both early construction activities and future development phases.

The use of horizontal directional drilling was utilised along sections of the offsite route, avoiding the need for disruptive excavation whilst accommodating the Section 58 restrictions. Combined with proactive stakeholder engagement and careful programme coordination, this approach enabled critical infrastructure to be delivered safely and efficiently while minimising disruption.

Project highlights

33kV/11kV primary substation delivered

Main infrastructure complete

Initial phases energised

The outcomes

Delivering long-term, scalable infrastructure enabling large-scale phased development – providing the capacity and network needed to support construction activities while enabling the site to grow for years to come.

Scope of works:

  • Securing 24MVA at the primary and 5MVA at the boundary substation
  • Design and installation of a 33kV primary substation and associated 33kV and 11kV infrastructure
  • Construction of site-wide 11kV distribution networks enabling future development.
  • Design and construction of two HV metered connections to serve a 20,000 seat events arena and temporary power supplies allowing for construction.
  • Delivery of electricity, gas and water connections for the initial phases, including houses, student accommodation, supermarket, offices and multi-story car park.
  • Enabling and coordinating utility approvals, testing, commissioning and network adoption with the relevant utility network operators and asset owners.
Last Mile: Brabazon

View more of our work…

Ntt Hh3

NTT Hemel Hempstead 3 Data Centre

Ironbridge Power Station June 2018 1280x800 Cropped2

Benthall Grange: repowering a landmark for 1,000 new homes

20240918indurent Park Chippenham05 Scaled 1

Indurent Park