Last Mile’s impact
Our scope of works included:
- Long-standing operator of the NTT HH3 site, with experience dating back to the site construction by Gyron in 2016
- Robust infrastructure featuring twin transformers and 30 MVA nominal capacity
- Ten metered circuits in operation, plus two bootstrapped connections supporting a neighbouring NTT site.
- Managed a complex 5 km cable route
- Modular, containerised switch rooms delivered and commissioned efficiently, with all units installed in a single day.
The network has demonstrated long-term operational resilience, including transformer maintenance works completed in 2025 with only three months’ notice and no interruption to customer supplies.