Industrial-scale multi-utility infrastructure
To power its advanced manufacturing operations, the new Schneider factory required substantial electrical capacity suitable for industrial-scale production. Last Mile needed to deliver two separate 1,625kVA connections for the factory units, supported by two new 2,000 kVA substations and a complete low-voltage network. The factory site also required a clean water solution, including a new water mains connection to the Yorkshire Water network, a dedicated fire main, and four hydrants.
Connection delays threaten the timeline
During the later stages of the development, connecting the newly finished water infrastructure to Yorkshire Water’s network was delayed when the incumbent’s team was unable to attend the site and make the final connection. This resulted in an open excavation at the site, preventing certain works from progressing, and it required Last Mile’s team to find tactical ways to keep the timeline on track.